2- and 3-tiered curved ceilings. Hidden lighting. Electrical wiring, installation of a sheetrock frame, cement-sand plastering under a beacon, tiling, laminate flooring, plumbing work (piping, installation of sinks and toilets, shower stalls). Installation of doors, windows, moldings (including gypsum). Facade work: staccato, brick, siding. Assembly and installation of decks (verandas) from composite boards of any shape. HIGH-QUALITY AND ON TIME. 9299880880
5 years of experience in total, I've done various projects, renovations, new buildings, services, I know how to work with water, sewerage, sprinklers, gas, I have OSHA 40
Have you implemented JobTread or Contractor Foreman, but there's still no clarity on the money?
The system alone won't solve the problem if the data logic, cost accounting, and reporting are poorly configured. I help troubleshoot the "Operations - QuickBooks - Project System" link so the owner can clearly see: • Where the margin is going and where you're losing money. • Which expenses are arriving late, distorting the true picture. • For which objects, the data is incorrect, hindering decision-making. I work precisely, without "inflated" projects and empty talk. Only diagnostics and a specific solution tailored to your needs.