Search category:     
All categories

Feedback  
   
  Advanced search  Manage my ads  
   
 
 
 

Construction, architecture, renovation

Builders of all trades with experience, OSHA, work, good conditions, $20-$30/hour. (347) 742-6359


Date Added: 01/10/2024 | Last Updated: 01/10/2024 | Page Views: 494
Average rating: 0.00 (out of 5)
Number of Ratings: 0 Votes
Rating:
 Guest book (0)

(No reviews found. Leave Feedback!)

People also interested in:

Electrical engineer required (high voltage laboratory)

Richards Manufacturing Co. NEW JERSEY
ELECTRICAL ENGINEER
(HIGH-VOLTAGE LABORATORY)
TESTING ELECTRICAL EQUIPMENT

REQUIREMENTS:
• Ability to read and design electrical circuits
• Experience in installation and diagnostics of electrical circuits
• Experience in PLC programming
• Experience with high-voltage equipment is welcome, but not required

RESPONSIBILITIES:
• Diagnostics and repair of test equipment (including PLC-based control systems)
• Control of high-voltage testing of manufactured products
• Analysis of test results and improvement of the testing process

✔ HIGH PAYMENT
✔ BENEFITS

RESUME: [email protected]
Call: 832-837-0563


 

Venetian plaster master

469_850_0660_ТРЕБУЕТСЯ_МАСТЕР_ПО_ВЕНЕЦИАНСКОЙ_ШТУКАТУРКЕ_2(3).png


 

Required

Do you want a stable job in the USA?
 

Brooklyn based company looking for plumbers

To the company in Brooklyn
Plumbers with experience in the USA are needed
Plumber's Assistant

347-515-3302 • 917-217-7092


 

Is the painting being assembled too late by subcontractors?

Because of this, the owner sees a distorted picture of projects, miscalculates profits, and notices financial gaps too late. I help bring order to subcontractor accounting: what has already been completed, what has been confirmed, what has not yet been paid, and how all this actually affects the cost and margins of the project. I build a clear logic for accounting for expenses, outstanding amounts, and documents for subcontractors so that funds do not leak through process chaos and the owner sees the real picture for each project. This is not bookkeeping or tax services. This is targeted work on problem areas that directly impact money and business management. QuickBooks / project cost flow / owner visibility Paid diagnostics